08/30/2012 7:42:15 PM EDT
200m head = about 20 Bar. Plastic pipework is available for this pressure range eg. xlpe. Discuss application with pipe manufacturer. Consider temperature of fluid, abrasion of pipe due to fluid/ externals, thermal expansion . Install non-return valves to prevent back-flow through pump and limit backflow in event of leak . Consider maintenance operations fit isolating valves etc. Provide signage warning of high pressure fluid.





Not a member? Sign Up
Reasons for Joining
Address your challenges through knowledge sharing with peers from our global network of specialists.
Benchmark your business initiatives with the who's who in the field.
Hear from industry pioneers how to maximize ROI in today's challenging economy.
And best of all It's FREE!