Evolve Composites

Pengelly Electrical - Concrete Design Case Study

Pengelly Electrical are electrical contractors, working in the fields of agriculture, commercial and mining.

In early 2012 they gained the contract to build the electrical pipeline for the Woornack, Rownack and Pirro (WRP) mine site in Ouyen, Victoria. Pengelly were advised the mine were planning on using solid concrete for the 600m of cable to be built. The cable was being built for a temporary setup of three years.

Pengelly had initial concerns of safety, time constraints and the lifting and handling involved in working with concrete. As such his team searched for a solution and one team member suggested Evo-Crete and the process was undertaken (detailed in whitepaper).

For more information please contact Angus Wood on (07) 3283 1196.

Pengelly Electrical - Concrete Design Case Study.

By entering in your information and submitting the form, you give the sponsor permission to contact you regarding their product.

To continue viewing this content please fill out the form below and become an Mining member.
Or if you're already a Mining member, sign in below to download.
You may login with either your assigned username or your e-mail address.
The password field is case sensitive.
Forgot your password?
Not a member?

Reasons for Joining
  • Address your challenges through knowledge sharing with peers from our global network of specialists.
  • Benchmark your business initiatives with the who's who in the field.
  • Hear from industry pioneers how to maximize ROI in today's challenging economy.
  • And best of all It's FREE!