Pengelly Electrical - Concrete Design Case Study

By:
Posted: 04/16/2013

Pengelly Electrical are electrical contractors, working in the fields of agriculture, commercial and mining.

In early 2012 they gained the contract to build the electrical pipeline for the Woornack, Rownack and Pirro (WRP) mine site in Ouyen, Victoria. Pengelly were advised the mine were planning on using solid concrete for the 600m of cable to be built. The cable was being built for a temporary setup of three years.

Pengelly had initial concerns of safety, time constraints and the lifting and handling involved in working with concrete. As such his team searched for a solution and one team member suggested Evo-Crete and the process was undertaken (detailed in whitepaper).

For more information please contact Angus Wood on (07) 3283 1196.

To continue viewing this content please fill out the form below and become an Mining member.
Or if you're already a Mining member, sign in below to download.
Subscribe

By entering in your information and submitting the form, you give the sponsor permission to contact you regarding their product and you agree to our User Agreement, Privacy Policy, and Cookie Policy.

By:
Posted: 04/16/2013